CN
TEL:
138-2572-5668
News
Current location:Home > News > Frequently asked questions

Contact Us

Shangsheng Acrylic Products Co., Ltd

Company Address: No. 19, 2nd Street, Central South, Santun Avenue, Houjie Town, Dongguan City

Company Phone: 0769-22888002 / 22888003

Mr. Tan 13922515414

How long is the delivery period for customized acrylic, and under what circumstances does the lead time extend?

2026-07-06

The most concerned aspect for customers after placing an order is the shipment time. Standard orders have a standard delivery cycle, but situations such as plate shortage, complex processes, drawing modifications, and peak season production scheduling can extend the delivery period. Below are the standard delivery cycles for different order types, along with detailed explanations of factors that cause delivery delays, to help customers plan inventory in advance and avoid risks of delays.

Standard standard orders (50 pieces or less, 5-8mm transparent plate, cutting + diamond polishing + single-sided UV printing, no heat bending irregular shapes): If the drawing is confirmed without error and plate inventory is sufficient, the standard delivery cycle is 5-7 days. Workshop process: 1 day for material cutting, 1-2 days for polishing and bonding, 1 day for dust-free UV printing, 1 day for full inspection and packaging, with 1 day buffer for temporary adjustments. Stable 5 days to complete, with extended to 7 days for larger quantities.

Small batch sample orders (1-5 sample pieces, irregular shapes, relief printing): Prioritize urgent order channel, delivery cycle 3-4 days. Sample orders simplify the batch production process, with dedicated staff for individual processing, suitable for e-commerce merchants to test products in advance. After sample confirmation, large orders can be made. If modifications to the drawing are needed after sample completion, it will add an extra 2-3 days for redoing.

Large batch chain whole orders (500 pieces or more in unified style): Produced in batches, with the first batch shipping within 3-5 days, and all completed within 7-10 days. Large batch orders are split into multiple production lines for simultaneous processing, with stable daily output for shipment in batches. Customers can receive orders in batches for store use, without waiting for complete delivery at once.

Complex irregular custom orders (heat bending in one piece, seamless bonding, double-sided relief printing, plates over 10mm thick): Standard delivery cycle 7-10 days. Heat bending requires baking, cooling, and resting, while seamless bonding takes longer to cure. Thick plates are slower to polish and cut, with complicated processes and high waste rate. Buffer time is reserved for rework, resulting in longer delivery cycles compared to standard products.

Several situations that easily extend the delivery period: First, repeated modifications to drawings, multiple adjustments to dimensions, patterns, and hole positions after ordering, each modification requiring re-arrangement and material cutting, resulting in a delay of 2-3 days; second, insufficient inventory of special specification boards, such as 1mm thin plates, 15mm thick plates, and special colored matte boards, requiring replenishment from suppliers, with a restocking period of 2-5 days, and production can only begin after arrival; third, order saturation during peak processing seasons, with workshops being tightly booked during offline store opening seasons and e-commerce inventory preparation periods, causing conventional orders to be delayed by 2-3 days on average; fourth, custom special hardware accessories and exclusive molds, with mold making and accessory procurement requiring additional time; fifth, excessive urgent requests from customers, with limited emergency production capacity in the workshop, a large number of urgent orders can extend the delivery period of regular orders.

Practical methods to shorten the delivery period: Confirm the complete drawing once before ordering to avoid changes midway; prioritize the use of the factory's standard 5mm transparent boards, avoiding customization of unpopular thicknesses or special color boards; simplify integrated hot bending of irregular shapes and switch to a splicing structure; place orders 10 days in advance to avoid peak seasons; avoid additional processes such as embossing or double-sided printing, and opt for basic single-sided glossy printing.

Shangsheng Acrylic will provide customers with accurate delivery times based on the style, board type, and order quantity upon ordering, without exaggerating quick delivery. At the same time, it distinguishes between three production lines—conventional orders, urgent orders, and sample orders—for分流, with urgent orders able to communicate and arrange for expedited channels to moderately compress the production schedule. If uncontrollable situations such as board shortages or equipment maintenance occur, business personnel will promptly inform customers, negotiate adjustments to delivery dates or alternative board solutions, and communicate in advance to reduce disruptions to customer inventory plans, ensuring order delivery is transparent and predictable.